Termite control · New construction
New construction and pre-slab termite treatment
The best time to protect a building from subterranean termites is before the concrete is poured. DG treats the soil under new slabs, finishes the barrier after the pour and at final grade, and treats exposed framing with Bora-Care. We do this work for custom homes, new subdivisions and commercial buildings across the Houston area.

Why treat before the slab?
Subterranean termites live in the soil and come up to find wood. The Houston area has heavy termite pressure, including the invasive Formosan subterranean termite, and a slab doesn't stop them on its own. They travel through cracks, expansion joints and the gaps around plumbing that comes up through the concrete.
Once the slab is poured, the soil underneath can only be reached by drilling. Treating it while it's still open lets the termiticide go exactly where it's needed: under the whole footprint and along the foundation trenches.
That's why treating before construction is the standard way to protect a new building, and why builders, buyers and lenders ask about it.

Stage 1 on a Houston job
What the pre-slab treatment looks like up close
Filmed from the technician's point of view on a Houston slab, this clip shows the first stage the way the crew sees it. Tinted liquid goes into the beam trenches and across the soil pads, then into the ground around each plumbing pipe that will come up through the concrete. By the end, the pads and trenches are evenly tinted and ready for the next trade, with other crews and our truck on site.
What the video shows
On screen: "Pre-slab termite treatment, Houston, TX." Spraying a trench and the soil pad beside it.
Treating the trench bottom and walls around the plumbing pipes.
Treated pads and trenches, then crews at work elsewhere on the site.
Our truck on site, then the closing card at 0:58.
More jobs at this stage: custom homes in Sugar Land, Cleveland and West University Place. Builders can see a whole Houston site on our builders page.
Recent job · Houston, TX · Pre-slab
Project stages
Termite treatment for new construction happens in stages
Texas rules (4 TAC §7.173) spell out how a pre-construction treatment has to be completed. In plain terms, it isn't a single visit:
- Stage 1 · Before the pour
Pre-slab soil treatment
After grading and trenching, once the plumbing is roughed in and before the vapor barrier goes down, we treat the soil across the slab footprint and along the trenches to form the horizontal barrier.
- Stage 2 · After the pour
Complete the vertical barrier
Once the slab is poured (or piers and beams are in place), we return to finish the vertical barrier around the foundation.
- Stage 3 · Final grade
Final treatment
The final treatment is due within 30 days of notice that landscaping is complete, or one year after construction is finished, whichever comes first.
Rules can change. We'll walk you through the current requirements for your specific job when we quote it.
The video above shows the first stage on a Houston job. Our crews at work are on the Termite Control page.
Full or partial treatment
A full treatment covers the entire structure. If the building design or site conditions prevent that, Texas allows a partial treatment, but it has to be documented and disclosed. We'll tell you which one your job is getting and why.
Commercial and multifamily buildings
Pretreatments on buildings other than single-family homes, such as commercial and multifamily projects, require advance notice to the Texas Department of Agriculture before the application. Give us your schedule early so the notice and visit line up with your pour.

Wood treatment
Bora-Care treatment for framing
Bora-Care is a wood treatment made with borate. It's sprayed onto bare framing, including sill plates, studs and other exposed lumber, after the house is dried in and before insulation and drywall cover it up. The borate soaks into the wood and makes it unappealing to termites and other insects that eat wood.
Texas recognizes a borate treatment of exposed framing, applied before the walls are enclosed, as a primary wood treatment. Depending on your project, it can be used alongside a pre-slab soil treatment or in place of one.
- Applied once framing is up and before the walls are closed
- Also useful on additions, remodels and exposed wood in existing buildings
- We'll explain coverage and timing so it fits your inspection schedule
Framing can be treated earlier too. On a Conroe job, we treated the new wood floor framing before the walls went up.

Quoting
What we need to quote your job
Price depends on the size of the slab, the linear footage of foundation, site access, and which treatments the job needs. Send what you have and we'll ask for anything missing.
Location
Job address or subdivision and lot, plus who to contact on site.
Size
Slab square footage, or the plans. Linear footage helps if you have it.
Timing
Your expected pour window and where the job is today.
Paperwork
Whether the home has an FHA or VA loan, and any form your lender or inspector needs.
Questions about termite treatment for new construction
Do new homes need termite treatment?
A new home has no termite damage yet, but it sits on soil where subterranean termites already live. Treating before the slab is poured is the simplest way to put a barrier between them and the house, and many builders and lenders expect it. Your project's requirements depend on the job, so ask us.
When should the termite pretreatment happen?
Right before the pour: after the site is graded, the trenches are dug and the plumbing is roughed in, but before the vapor barrier goes down. Then there's a return visit after the slab and a final treatment at the end of landscaping.
How long does a termite pretreatment last?
It depends on the product used, the soil, and what happens around the foundation later, such as landscaping, new beds or plumbing repairs. We'll tell you what product goes on your job and how owners can keep the protection in place after they move in, including periodic inspections.
What is the NPMA-99-B form?
The HUD-NPMA-99-B is the record of a subterranean termite treatment on new construction, used for many homes with FHA or VA loans. The builder completes a companion form (99-A). If your lender needs it, tell us when you request a quote.
Project quote
Request a quote for pre-slab or new construction work
Builders, GCs and owner builders: send the basics and we'll respond within 24 hours.
Building with a lot of repeat work? See builder and contractor accounts. Worried about termites in a home that's already built? Go to termite control & free inspections.
Thanks, your project details were sent
DG Pest Control & Termite received your request. We respond to every inquiry within 24 hours, usually by phone. This isn't a confirmed appointment yet. We'll confirm a time with you. Urgent? Call 346-846-3170.
Your request didn't go through
Something went wrong and your request was not sent. Your answers are still in the form. Please try again, or call us at 346-846-3170.
