Termite control · New construction

New construction and pre-slab termite treatment

The best time to protect a building from subterranean termites is before the concrete is poured. DG treats the soil under new slabs, finishes the barrier after the pour and at final grade, and treats exposed framing with Bora-Care. We do this work for custom homes, new subdivisions and commercial buildings across the Houston area.

DG technician applying a liquid termite treatment to foundation trenches before a slab is poured
Treating foundation trenches before the slab is poured.

Why treat before the slab?

Subterranean termites live in the soil and come up to find wood. The Houston area has heavy termite pressure, including the invasive Formosan subterranean termite, and a slab doesn't stop them on its own. They travel through cracks, expansion joints and the gaps around plumbing that comes up through the concrete.

Once the slab is poured, the soil underneath can only be reached by drilling. Treating it while it's still open lets the termiticide go exactly where it's needed: under the whole footprint and along the foundation trenches.

That's why treating before construction is the standard way to protect a new building, and why builders, buyers and lenders ask about it.

Aerial view of a Houston slab site during a pre-slab termite treatment, with treated and untreated sections visible
Aerial view of a Houston slab site partway through a pre-slab treatment.

Stage 1 on a Houston job

What the pre-slab treatment looks like up close

Filmed from the technician's point of view on a Houston slab, this clip shows the first stage the way the crew sees it. Tinted liquid goes into the beam trenches and across the soil pads, then into the ground around each plumbing pipe that will come up through the concrete. By the end, the pads and trenches are evenly tinted and ready for the next trade, with other crews and our truck on site.

What the video shows

  1. On screen: "Pre-slab termite treatment, Houston, TX." Spraying a trench and the soil pad beside it.

  2. Treating the trench bottom and walls around the plumbing pipes.

  3. Treated pads and trenches, then crews at work elsewhere on the site.

  4. Our truck on site, then the closing card at 0:58.

More jobs at this stage: custom homes in Sugar Land, Cleveland and West University Place. Builders can see a whole Houston site on our builders page.

Recent job · Houston, TX · Pre-slab

Pre-slab termite treatment in Houston · 1:01 · music, no narration.

Project stages

Termite treatment for new construction happens in stages

Texas rules (4 TAC §7.173) spell out how a pre-construction treatment has to be completed. In plain terms, it isn't a single visit:

  1. Stage 1 · Before the pour

    Pre-slab soil treatment

    After grading and trenching, once the plumbing is roughed in and before the vapor barrier goes down, we treat the soil across the slab footprint and along the trenches to form the horizontal barrier.

  2. Stage 2 · After the pour

    Complete the vertical barrier

    Once the slab is poured (or piers and beams are in place), we return to finish the vertical barrier around the foundation.

  3. Stage 3 · Final grade

    Final treatment

    The final treatment is due within 30 days of notice that landscaping is complete, or one year after construction is finished, whichever comes first.

Rules can change. We'll walk you through the current requirements for your specific job when we quote it.

The video above shows the first stage on a Houston job. Our crews at work are on the Termite Control page.

Full or partial treatment

A full treatment covers the entire structure. If the building design or site conditions prevent that, Texas allows a partial treatment, but it has to be documented and disclosed. We'll tell you which one your job is getting and why.

Commercial and multifamily buildings

Pretreatments on buildings other than single-family homes, such as commercial and multifamily projects, require advance notice to the Texas Department of Agriculture before the application. Give us your schedule early so the notice and visit line up with your pour.

Treated foundation trenches around the plumbing on a slab site before the pour
Treated trenches around the plumbing, ready for the next trade.

Wood treatment

Bora-Care treatment for framing

Bora-Care is a wood treatment made with borate. It's sprayed onto bare framing, including sill plates, studs and other exposed lumber, after the house is dried in and before insulation and drywall cover it up. The borate soaks into the wood and makes it unappealing to termites and other insects that eat wood.

Texas recognizes a borate treatment of exposed framing, applied before the walls are enclosed, as a primary wood treatment. Depending on your project, it can be used alongside a pre-slab soil treatment or in place of one.

  • Applied once framing is up and before the walls are closed
  • Also useful on additions, remodels and exposed wood in existing buildings
  • We'll explain coverage and timing so it fits your inspection schedule

Framing can be treated earlier too. On a Conroe job, we treated the new wood floor framing before the walls went up.

Framing inside a house under construction after Bora-Care was applied to the lower studs
Lower framing treated with Bora-Care before the walls are closed in.

Quoting

What we need to quote your job

Price depends on the size of the slab, the linear footage of foundation, site access, and which treatments the job needs. Send what you have and we'll ask for anything missing.

Location

Job address or subdivision and lot, plus who to contact on site.

Size

Slab square footage, or the plans. Linear footage helps if you have it.

Timing

Your expected pour window and where the job is today.

Paperwork

Whether the home has an FHA or VA loan, and any form your lender or inspector needs.

Questions about termite treatment for new construction

Do new homes need termite treatment?

A new home has no termite damage yet, but it sits on soil where subterranean termites already live. Treating before the slab is poured is the simplest way to put a barrier between them and the house, and many builders and lenders expect it. Your project's requirements depend on the job, so ask us.

When should the termite pretreatment happen?

Right before the pour: after the site is graded, the trenches are dug and the plumbing is roughed in, but before the vapor barrier goes down. Then there's a return visit after the slab and a final treatment at the end of landscaping.

How long does a termite pretreatment last?

It depends on the product used, the soil, and what happens around the foundation later, such as landscaping, new beds or plumbing repairs. We'll tell you what product goes on your job and how owners can keep the protection in place after they move in, including periodic inspections.

What is the NPMA-99-B form?

The HUD-NPMA-99-B is the record of a subterranean termite treatment on new construction, used for many homes with FHA or VA loans. The builder completes a companion form (99-A). If your lender needs it, tell us when you request a quote.

Project quote

Request a quote for pre-slab or new construction work

Builders, GCs and owner builders: send the basics and we'll respond within 24 hours.

Building with a lot of repeat work? See builder and contractor accounts. Worried about termites in a home that's already built? Go to termite control & free inspections.

required
optional

Owner builders can leave this blank.

Phone or email: one is enough. We usually reply by phone.

required
required
Treatment or service needed required Choose all that apply
Square footage, timing and account details optional
optional
optional
optional
optional
optional
Preferred language / Idioma preferido

We respond to every inquiry within 24 hours. Urgent? Call 346-846-3170.